Premier Furnace Specialists and BeaverMatic completed a $2.5 million building expansion at one of its Farmington Hills, Mich., facilities. The expansion provides 45-foot-high ceilings with two (25-ton and 10-ton) overhead cranes to complement the existing two 10-ton overhead cranes. The total square feet under one roof is now 40,000. The expansion was needed for the continued growth of both companies and to accommodate the magnitude of the furnaces being built. The companies intend to hire additional employees in the future.