Industrial Heating Magazine
 Home
 Subscribe
 eNews Subscribe
 Subscription Customer Service
 Searchable Directories
 In This Issue
 Features
 Columns
 Industry News
 Products
 Tech Literature
 Online Resources
 Webinars
 Archives
 The Experts Speak Blog
 IH TV
 Podcasts
 White Papers
 Classified Ads
 Industry Links
 Market Research
 Web Search Power Pages
 FORGE Magazine
 IH Info
 Media Kit
Search in: EditorialProductsCompanies
Tenova Commissions Two Furnaces

July 2, 2009

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare



Tenova Italimpianti Deutschland GmbH, a company of Tenova LOI Italimpianti, commissioned two furnaces in June. On June 10, the first slab was discharged from a pusher furnace designed, realized and installed by Tenova at GTS Industries’ plate mill in Dunkerque, France. The furnace is designed for a capacity of 200 tons/hour to heat up slabs with different qualities up to 1250°C (2282°F). Two days later, the furnace reached nearly the nominal throughput with full satisfaction of the customer. On June 26, the first hot slab was discharged from the walking-beam furnace at the Salzgitter Flachstahl hot-strip mill in Germany.

The walking-beam furnace – designed and installed by Tenova – has a capacity of 300 tons/hour to heat up slabs with different qualities up to 1280°C (2336°F). The furnace, which was commissioned one week earlier than scheduled, is running with a significant production in parallel with two other Tenova furnaces in three shifts and in automatic mode.


|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.
BNP Media
© 2010 BNP Media. All rights reserved. | Privacy Policy