Industrial Heating Magazine
 Home
 Subscribe
 eNews Subscribe
 Subscription Customer Service
 Searchable Directories
 In This Issue
 Features
 Columns
 Industry News
 Products
 Tech Literature
 Online Resources
 Webinars
 Archives
 The Experts Speak Blog
 IH TV
 Podcasts
 White Papers
 Classified Ads
 Industry Links
 Market Research
 Web Search Power Pages
 FORGE Magazine
 IH Info
 Media Kit
Search in: EditorialProductsCompanies
BeaverMatic Awarded Contract from Boeing

March 29, 2007

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare



BeaverMatic (Rockford, Ill.) has been awarded a contract from Boeing (Portland, Ore.) to design and build an electric internal quench furnace with a load size of 30 inches wide x 48 inches deep x 20 inches high to harden 1,000-pound loads of aerospace components. This internal quench batch furnace will handle additional production requirements and will be integrated among Boeing’s previously installed BeaverMatic IQF furnace line, which includes a stationary load/unload table, washer and generator.


|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.
BNP Media
© 2010 BNP Media. All rights reserved. | Privacy Policy